{"id":33320,"date":"2023-08-10T10:47:18","date_gmt":"2023-08-10T10:47:18","guid":{"rendered":"https:\/\/elinformante.mx\/?p=33320"},"modified":"2023-08-10T10:47:19","modified_gmt":"2023-08-10T10:47:19","slug":"lia-limon-entrega-mas-de-18-mil-metros-cuadrados-de-repavimentacion-e-inicia-encarpetado-en-prolongacion-mixcoac","status":"publish","type":"post","link":"https:\/\/elinformante.mx\/?p=33320","title":{"rendered":"L\u00eda Lim\u00f3n entrega m\u00e1s de 18 mil metros cuadrados de repavimentaci\u00f3n e inicia encarpetado en Prolongaci\u00f3n Mixcoac"},"content":{"rendered":"\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>La alcaldesa en \u00c1lvaro Obreg\u00f3n puso en marcha el re encarpetado de m\u00e1s de 8 mil metros cuadrados en Prolongaci\u00f3n R\u00edo Mixcoac entre Alta Tensi\u00f3n y Circuito 1 en la colonia La Cascada, cuya inversi\u00f3n asciende a casi 3 mdp.<\/p>\n<\/blockquote>\n\n\n\n<p>La alcaldesa L\u00eda lim\u00f3n puso en marcha el re encarpetado de m\u00e1s de ocho mil metros cuadrados en Prolongaci\u00f3n R\u00edo Mixcoac entre Alta Tensi\u00f3n y Circuito 1 en la colonia La Cascada, cuya inversi\u00f3n asciende a casi tres millones de pesos.<br><\/p>\n\n\n\n<p>Asimismo, entreg\u00f3 obras en 2 colonias de la demarcaci\u00f3n con una inversi\u00f3n de casi 5 millones de pesos provenientes del Fondo de Aportaciones para la Infraestructura Social (FAIS).<br><\/p>\n\n\n\n<p>De esta manera, alrededor de 25 mil vecinas y vecinos de las colonias Olivar de los Padres y Progreso Tizap\u00e1n se vieron beneficiados con obras de repavimentaci\u00f3n.<br><\/p>\n\n\n\n<p>En total se repavimentaron m\u00e1s de 18 mil metros cuadrados de vialidades.<br><\/p>\n\n\n\n<p>Los trabajos realizados incluyen: fresado y retiro de material; construcci\u00f3n de la carpeta asf\u00e1ltica; y, balizamiento.<br><\/p>\n\n\n\n<p>L\u00eda Lim\u00f3n destac\u00f3 que estas acciones son muestra de lo que un gobierno de primer contacto debe hacer en beneficio de la comunidad.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La alcaldesa en \u00c1lvaro Obreg\u00f3n puso en marcha el re encarpetado de m\u00e1s de 8 mil metros cuadrados en Prolongaci\u00f3n R\u00edo Mixcoac entre Alta Tensi\u00f3n y Circuito 1 en la colonia La Cascada, cuya inversi\u00f3n asciende a casi 3 mdp. La alcaldesa L\u00eda lim\u00f3n puso en marcha el re encarpetado de m\u00e1s de ocho mil [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":33321,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"class_list":["post-33320","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cdmx"],"_links":{"self":[{"href":"https:\/\/elinformante.mx\/index.php?rest_route=\/wp\/v2\/posts\/33320","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elinformante.mx\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/elinformante.mx\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/elinformante.mx\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/elinformante.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=33320"}],"version-history":[{"count":0,"href":"https:\/\/elinformante.mx\/index.php?rest_route=\/wp\/v2\/posts\/33320\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/elinformante.mx\/index.php?rest_route=\/wp\/v2\/media\/33321"}],"wp:attachment":[{"href":"https:\/\/elinformante.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=33320"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/elinformante.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=33320"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elinformante.mx\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=33320"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}